Proximo Spirits | Distillery Expansion Feasibility Study

Black Dirt – Proximo Spirits
United States
FEL 1 through FEL 3 integrated design services supporting long-term distillery expansion planning, infrastructure development, and tenfold production growth at the Black Dirt distillery.
Key Features
FEL 1, FEL 2, and FEL 3 integrated design services
Tenfold distillery production growth evaluation
Production capacity expansion planning
Deep-water well development analysis
Wastewater treatment facility planning
Sustainable power generation concepts
Visitor center planning
Site-wide infrastructure and utility analysis

Scope of Work
The feasibility study evaluated distillery expansion requirements across production systems, utilities, sustainability infrastructure, and site development. Vestal’s scope included analysis and conceptual design supporting significant production growth while ensuring future infrastructure systems could meet long-term operational demands.
In addition to production expansion, the study addressed supporting site systems including water sourcing, wastewater treatment, power generation, and visitor facilities to support a fully integrated expansion strategy.
Project Impact
The Distillery Expansion Feasibility Study provided Proximo Spirits with a clear, actionable roadmap for scaling operations at the Black Dirt distillery.
Vestal’s integrated FEL approach supported informed decision-making, reduced project risk, and enabled long-term capital planning—positioning the facility for sustainable growth and future expansion.
Services
FEL 1 Integrated Design Services
FEL 2 Integrated Design Services
FEL 3 Integrated Design Services

Work with Us
Partner with Vestal to plan, design, and deliver complex facilities with confidence.