Proximo Spirits | Distillery Expansion Feasibility Study

Black Dirt – Proximo Spirits

United States

FEL 1 through FEL 3 integrated design services supporting long-term distillery expansion planning, infrastructure development, and tenfold production growth at the Black Dirt distillery.

Key Features

FEL 1, FEL 2, and FEL 3 integrated design services

Tenfold distillery production growth evaluation

Production capacity expansion planning

Deep-water well development analysis

Wastewater treatment facility planning

Sustainable power generation concepts

Visitor center planning

Site-wide infrastructure and utility analysis

Proximo Spirits - Black Dirt

Scope of Work

The feasibility study evaluated distillery expansion requirements across production systems, utilities, sustainability infrastructure, and site development. Vestal’s scope included analysis and conceptual design supporting significant production growth while ensuring future infrastructure systems could meet long-term operational demands.


In addition to production expansion, the study addressed supporting site systems including water sourcing, wastewater treatment, power generation, and visitor facilities to support a fully integrated expansion strategy.

Project Impact

The Distillery Expansion Feasibility Study provided Proximo Spirits with a clear, actionable roadmap for scaling operations at the Black Dirt distillery.


Vestal’s integrated FEL approach supported informed decision-making, reduced project risk, and enabled long-term capital planning—positioning the facility for sustainable growth and future expansion.

Services

FEL 1 Integrated Design Services

FEL 2 Integrated Design Services

FEL 3 Integrated Design Services

Proximo Spirits - Black Dirt

Work with Us


Partner with Vestal to plan, design, and deliver complex facilities with confidence.

Similar Projects

Ziemann Holvrieka | Bulk Starch Unloading & Delivery System
By Vestal Corp February 25, 2026
Architecture and engineering services for a high-seismic bulk starch unloading system with 18 silos and 665 MT/day production capacity.
Unifirst | Industrial Laundry Facility
By Vestal Corp February 25, 2026
Architecture and engineering services for a 56,500 SF design-build industrial laundry facility with heavy process equipment and integrated workflow systems.
TG Missouri Corporation (Toyoda) | Manufacturing Facility Addition
By Vestal Corp February 25, 2026
Architecture and engineering services for a 100,000 SF two-phase automotive manufacturing expansion with process piping, paint booths, and explosion-proof design.
SHOW MORE