Unifirst | Industrial Laundry Facility

Unifirst

United States

Architecture and engineering services for a 56,500-square-foot tilt-up industrial laundry facility delivered through a design-build approach.

Key Features

56,500 SF tilt-up facility

Design-build delivery

Industrial washing and drying systems

Four industrial washing machines

Industrial gas dryers

Steaming tunnel system

Overhead superstack cranes

Garment overhead conveying and sorting systems

Mezzanine level

First and second-floor offices

Locker rooms and welfare spaces

Unifirst

Scope of Work

Vestal Corporation provided architecture and engineering services for a 56,500-square-foot tilt-up industrial laundry facility.


The facility includes four industrial washing machines, industrial gas dryers, a steaming tunnel, and extensive overhead garment conveying and sorting systems. The program incorporated mezzanine space, first and second-floor offices, restrooms, breakrooms, locker rooms, meeting rooms, and shipping and receiving areas.


Delivered under a design-build method, the project required coordination of heavy process equipment, structural systems, mechanical infrastructure, and workflow optimization within a high-throughput laundry operation.

Project Impact

The facility supports high-volume industrial laundry operations with efficient material flow and integrated building systems.


Vestal’s design-build approach streamlined delivery while optimizing production efficiency, employee support spaces, and long-term operational performance.

Services

Architecture

Civil Engineering

Structural Engineering

Mechanical Engineering

Electrical Engineering

Construction Administration

Work with Us


Partner with Vestal to plan, design, and deliver complex facilities with confidence.

Similar Projects

Ziemann Holvrieka | Bulk Starch Unloading & Delivery System
By Vestal Corp February 25, 2026
Architecture and engineering services for a high-seismic bulk starch unloading system with 18 silos and 665 MT/day production capacity.
TG Missouri Corporation (Toyoda) | Manufacturing Facility Addition
By Vestal Corp February 25, 2026
Architecture and engineering services for a 100,000 SF two-phase automotive manufacturing expansion with process piping, paint booths, and explosion-proof design.
Ardagh Group | Can Plant Expansion
By Vestal Corp February 25, 2026
Architecture and engineering services for a 54,000 SF expansion supporting new aluminum bottle lines, heavy foundations, and extensive site civil improvements.
SHOW MORE