Mechanical and electrical engineering services supporting humidity control optimization, cooling system performance improvements, and enhanced environmental consistency within critical production areas at Molson Coors’ active brewery facility.

Key Features

Kathabar system evaluation and optimization

Humidity and cooling system performance improvements

Cold Services and Yeast Room upgrades

Fermenting and Aging Corridor improvements

Aging Cellar and PRT Cellar system upgrades

New pumps, fans, and dehumidification equipment

Cooling coils, heat exchangers, and piping systems

Development of P&IDs and control sequences

Molson Coors

Scope of Work

The project addressed humidity and cooling challenges impacting several key brewery process areas, including Cold Services, the Yeast Room, Fermenting Corridors, Aging Corridors, the Aging Cellar, and the PRT Cellar.


Vestal developed demolition drawings and designed replacement systems to improve environmental control and overall system performance. The scope included system analysis, equipment selection, piping design, and control documentation to support proper operation and long-term reliability.

Project Impact

The Brewery Systems Optimization project improved environmental control and system performance across critical brewing areas at the Molson Coors facility.


Vestal’s targeted engineering solutions resolved existing operational challenges, enhanced system reliability, and supported consistent production conditions within an active manufacturing environment.

Services

Mechanical Engineering

Electrical Engineering

Design Calculations

Construction Consulting

Work with Us


Partner with Vestal to plan, design, and deliver complex facilities with confidence.

Similar Projects

Ziemann Holvrieka | Bulk Starch Unloading & Delivery System
By Vestal Corp February 25, 2026
Architecture and engineering services for a high-seismic bulk starch unloading system with 18 silos and 665 MT/day production capacity.
Unifirst | Industrial Laundry Facility
By Vestal Corp February 25, 2026
Architecture and engineering services for a 56,500 SF design-build industrial laundry facility with heavy process equipment and integrated workflow systems.
TG Missouri Corporation (Toyoda) | Manufacturing Facility Addition
By Vestal Corp February 25, 2026
Architecture and engineering services for a 100,000 SF two-phase automotive manufacturing expansion with process piping, paint booths, and explosion-proof design.