Molson Coors | Brewery Systems Optimization

Molson Coors
United States
Mechanical and electrical engineering services supporting humidity control optimization, cooling system performance improvements, and enhanced environmental consistency within critical production areas at Molson Coors’ active brewery facility.
Key Features
Kathabar system evaluation and optimization
Humidity and cooling system performance improvements
Cold Services and Yeast Room upgrades
Fermenting and Aging Corridor improvements
Aging Cellar and PRT Cellar system upgrades
New pumps, fans, and dehumidification equipment
Cooling coils, heat exchangers, and piping systems
Development of P&IDs and control sequences

Scope of Work
The project addressed humidity and cooling challenges impacting several key brewery process areas, including Cold Services, the Yeast Room, Fermenting Corridors, Aging Corridors, the Aging Cellar, and the PRT Cellar.
Vestal developed demolition drawings and designed replacement systems to improve environmental control and overall system performance. The scope included system analysis, equipment selection, piping design, and control documentation to support proper operation and long-term reliability.
Project Impact
The Brewery Systems Optimization project improved environmental control and system performance across critical brewing areas at the Molson Coors facility.
Vestal’s targeted engineering solutions resolved existing operational challenges, enhanced system reliability, and supported consistent production conditions within an active manufacturing environment.
Services
Mechanical Engineering
Electrical Engineering
Design Calculations
Construction Consulting
Work with Us
Partner with Vestal to plan, design, and deliver complex facilities with confidence.




