Constellation Brands | Greenfield Brewery Development

Constellation Brands

United States

Master planning, architecture, and engineering services supporting a 900-acre greenfield brewery campus, delivering high-volume production capabilities, integrated utilities infrastructure, and seismic-resilient design for Constellation Brands’ large-scale manufacturing operations.

Key Features

30 million hectoliter per year brewery

900-acre greenfield site in a high seismic zone

Brew house

Packaging hall

Glass plant

Wastewater treatment (WWT) facilities

Water treatment systems

Engine house

Executive center and administration buildings

ASR warehouse

Silos and tank farm

Employee welfare spaces

Sports and recreation fields

Constellation Brands

Scope of Work

The Greenfield Brewery Development included the planning and design of a new brewery campus capable of producing 30 million hectoliters per year. The scope encompassed a comprehensive site program supporting brewing, packaging, utilities, logistics, and employee facilities across a large greenfield footprint.


Vestal’s multidisciplinary teams coordinated production buildings, infrastructure systems, and site development features to support efficient operations, seismic resilience, and long-term expansion.

Project Impact

The Greenfield Brewery Development established a high-performance manufacturing campus designed to support Constellation Brands’ long-term production goals. Vestal’s integrated planning and engineering approach delivered a resilient facility platform built for high-volume output, operational efficiency, and future expansion while addressing the complex seismic demands of the site.

Services

Master Planning

Architecture

Civil Engineering

Structural Engineering

Mechanical Engineering

Process Piping

HVAC

Plumbing

Fire Protection Engineering

Electrical Engineering

Construction Administration

Full-Time Onsite Support

Constellation Brands

Work with Us


Partner with Vestal to plan, design, and deliver complex facilities with confidence.

Similar Projects

Ziemann Holvrieka | Bulk Starch Unloading & Delivery System
By Vestal Corp February 25, 2026
Architecture and engineering services for a high-seismic bulk starch unloading system with 18 silos and 665 MT/day production capacity.
Unifirst | Industrial Laundry Facility
By Vestal Corp February 25, 2026
Architecture and engineering services for a 56,500 SF design-build industrial laundry facility with heavy process equipment and integrated workflow systems.
TG Missouri Corporation (Toyoda) | Manufacturing Facility Addition
By Vestal Corp February 25, 2026
Architecture and engineering services for a 100,000 SF two-phase automotive manufacturing expansion with process piping, paint booths, and explosion-proof design.
SHOW MORE