CONSTELLATION BRANDS BREWERY EXPANSION



CLIENT


Constellation Brands


LOCATION


Mexicali, Mexico

SIZE


600 Acres

Vestal Corporation served as the Prime Engineer and Overall Design Manager for Constellation Brands' brewery development in Mexicali, Mexico. The project included the planning and design of a 600-acre site with a long-term master plan supporting up to 20 million hectoliters of annual production capacity. The initial phase was designed to deliver 10 million hectoliters per year and represented a major investment in expanding brewing operations and infrastructure.

Constellation Brands brewery

scope of work:

Vestal provided detailed civil, structural, architectural, mechanical, plumbing, and electrical engineering design services for the brewery campus. The scope included site civil engineering, railway design, process utilities piping design, technical specifications development, site supervision, and multidisciplinary construction coordination. As the overall design manager, Vestal oversaw the integration of civil, structural, mechanical, electrical, and utility systems throughout project execution.

Services Provided:

Vestal provided complete engineering design, site development, and construction coordination services for the brewery campus.

Project impact


The project established a scalable brewery campus capable of supporting long-term production growth. Through integrated engineering, site planning, and construction coordination, Vestal helped create the infrastructure and facility systems necessary to support efficient operations and future expansion.

SUPPORTING FUTURE PRODUCTION GROWTH THROUGH STRATEGIC FACILITY DEVELOPMENT

Work with us


Partner with Vestal to plan, design, and deliver complex facilities with confidence.