Buzzi Unicem | Dust Collection System Upgrade

BUZZI UNICEM

United States

Architecture and engineering services supporting a large-scale dust collection system upgrade for heavy industrial operations at Buzzi Unicem.

Key Features

Field-erected dust collector

2,000 HP medium-voltage blower

1,250 HP medium-voltage blower

Foundation for 250-foot-tall exhaust stack

5, 7, 9, and 10-foot diameter high-temperature ductwork

Structural steel support systems

Heavy mechanical equipment integration

Industrial foundation design

Scope of Work

Vestal Corporation provided architecture and engineering services for a major dust collection system upgrade at Buzzi Unicem’s Cape Girardeau facility.


The project included a field-erected dust collector, medium-voltage 2,000 horsepower and 1,250 horsepower blowers, and a foundation system supporting a 250-foot-tall exhaust stack. Extensive high-temperature structural ductwork ranging from 5 to 10 feet in diameter was engineered to support industrial process demands.


Design coordination addressed heavy mechanical equipment integration, structural supports, and foundation systems within an active industrial cement manufacturing environment.

Project Impact

The dust collection upgrade improved environmental control, operational reliability, and regulatory compliance within Buzzi Unicem’s manufacturing operations.


Vestal’s integrated engineering approach strengthened system performance while supporting long-term durability under high-temperature, heavy-industrial operating conditions.

Services

Architecture

Civil Engineering

Structural Engineering

Mechanical Engineering

Electrical Engineering

Work with Us


Partner with Vestal to plan, design, and deliver complex facilities with confidence.

Similar Projects

Ziemann Holvrieka | Bulk Starch Unloading & Delivery System
By Vestal Corp February 25, 2026
Architecture and engineering services for a high-seismic bulk starch unloading system with 18 silos and 665 MT/day production capacity.
Unifirst | Industrial Laundry Facility
By Vestal Corp February 25, 2026
Architecture and engineering services for a 56,500 SF design-build industrial laundry facility with heavy process equipment and integrated workflow systems.
TG Missouri Corporation (Toyoda) | Manufacturing Facility Addition
By Vestal Corp February 25, 2026
Architecture and engineering services for a 100,000 SF two-phase automotive manufacturing expansion with process piping, paint booths, and explosion-proof design.
SHOW MORE