Brewer Science | Advanced Manufacturing Facility

Brewer Science

United States

Architecture and engineering services for a 40,000-square-foot advanced manufacturing facility supporting cleanrooms, high-hazard solvents, laboratories, and precision production environments.

Key Features

40,000 SF manufacturing facility

10-acre site development

Cleanroom production environments

High-hazard solvent handling systems

Blending and filling operations

Laboratory spaces

Office and administrative areas

Warehouse and logistics integration

Design-build delivery

Scope of Work

Vestal Corporation provided architecture and engineering services for a 40,000-square-foot advanced manufacturing facility located on a 10-acre site in Rolla, Missouri.


The facility supports semiconductor industry coatings and incorporates cleanroom environments, blending and filling systems, laboratory spaces, warehouse operations, and office areas. Design efforts addressed high-hazard solvent handling, ventilation requirements, life safety coordination, and industrial process integration.


Delivered using a design-build approach, the project required careful coordination of manufacturing workflows, utilities systems, and hazardous material protocols within a precision production environment.

Project Impact

The facility strengthens Brewer Science’s advanced manufacturing capabilities while supporting cleanroom precision, operational safety, and scalable growth.


Vestal’s integrated engineering approach delivered a high-performance production environment capable of meeting stringent industry standards for semiconductor and specialty coatings manufacturing.

Services

Architecture

Civil Engineering

Structural Engineering

Mechanical Engineering

Electrical Engineering

Construction Administration

Work with Us


Partner with Vestal to plan, design, and deliver complex facilities with confidence.

Similar Projects

Ziemann Holvrieka | Bulk Starch Unloading & Delivery System
By Vestal Corp February 25, 2026
Architecture and engineering services for a high-seismic bulk starch unloading system with 18 silos and 665 MT/day production capacity.
Unifirst | Industrial Laundry Facility
By Vestal Corp February 25, 2026
Architecture and engineering services for a 56,500 SF design-build industrial laundry facility with heavy process equipment and integrated workflow systems.
TG Missouri Corporation (Toyoda) | Manufacturing Facility Addition
By Vestal Corp February 25, 2026
Architecture and engineering services for a 100,000 SF two-phase automotive manufacturing expansion with process piping, paint booths, and explosion-proof design.
SHOW MORE