Beam Suntory | Booker Noe Distillery

Beam Suntory

United States

Integrated architecture and engineering services supporting distillery expansion, production system enhancements, and infrastructure development at Beam Suntory’s Booker Noe Distillery.

Key Features

Bourbon distillation system expansion

Mash cooking and fermentation systems

Distillation column and process integration

Tank farm and storage coordination

Utilities infrastructure upgrades

Steam and thermal systems

Water treatment and wastewater systems

Power distribution improvements

Barrel handling and warehouse coordination

Active facility construction phasing

Beam Suntory

Scope of Work

Vestal Corporation provided integrated architecture and engineering services to support expansion and infrastructure improvements at the Booker Noe Distillery. The project focused on increasing bourbon production capacity while enhancing utilities systems and operational efficiency within an active distilling environment.


Scope elements included process system integration, distillation equipment coordination, tank storage infrastructure, and upgrades to steam, water, wastewater, and power systems. Design and construction activities were carefully phased to maintain continuous operations while enabling long-term scalability.

Project Impact

The expansion strengthened production capacity and operational performance at the Booker Noe Distillery while maintaining uninterrupted operations.


Vestal’s integrated design approach aligned process systems and site utilities to support scalable growth, improved reliability, and long-term efficiency. The facility is positioned to meet increasing demand while maintaining the heritage and performance standards associated with Beam Suntory’s bourbon brands.

Services

Architecture

Civil Engineering

Structural Engineering

Mechanical Engineering

Electrical Engineering

Process Engineering

Construction Administration

On-Site Support

Beam Suntory

Work with Us


Partner with Vestal to plan, design, and deliver complex facilities with confidence.

Similar Projects

Ziemann Holvrieka | Bulk Starch Unloading & Delivery System
By Vestal Corp February 25, 2026
Architecture and engineering services for a high-seismic bulk starch unloading system with 18 silos and 665 MT/day production capacity.
Unifirst | Industrial Laundry Facility
By Vestal Corp February 25, 2026
Architecture and engineering services for a 56,500 SF design-build industrial laundry facility with heavy process equipment and integrated workflow systems.
TG Missouri Corporation (Toyoda) | Manufacturing Facility Addition
By Vestal Corp February 25, 2026
Architecture and engineering services for a 100,000 SF two-phase automotive manufacturing expansion with process piping, paint booths, and explosion-proof design.
SHOW MORE