Ardagh Group | Can Plant Expansion

Ardagh Group

United States

Integrated architecture and engineering services supporting a 54,000-square-foot expansion for two new aluminum bottle production lines and heavy equipment foundations.

Key Features

54,000 SF facility expansion

Two new aluminum bottle production lines

Heavy equipment foundations

Eight new dock doors

Extensive site civil improvements

Multiple large retaining walls

Integrated design services delivery

Ardagh Group

Scope of Work

Vestal Corporation provided integrated architecture and engineering services for a 54,000-square-foot expansion at Ardagh Group’s manufacturing facility.


The expansion supports two new aluminum bottle production lines and includes heavy equipment foundations designed to accommodate high-load industrial systems. The project also incorporated eight new dock doors to improve material flow and shipping capacity.


Extensive site civil work was required, including the design and coordination of multiple large retaining walls to support facility expansion and optimize site grading within an active industrial environment.

Project Impact

The expansion increased production capacity and strengthened operational logistics within Ardagh Group’s facility.


Vestal’s integrated design approach enhanced structural performance, site efficiency, and long-term scalability while supporting advanced aluminum bottle manufacturing operations.

Services

Architecture

Civil Engineering

Structural Engineering

Mechanical Engineering

Electrical Engineering

Construction Administration

Work with Us


Partner with Vestal to plan, design, and deliver complex facilities with confidence.

Similar Projects

Ziemann Holvrieka | Bulk Starch Unloading & Delivery System
By Vestal Corp February 25, 2026
Architecture and engineering services for a high-seismic bulk starch unloading system with 18 silos and 665 MT/day production capacity.
Unifirst | Industrial Laundry Facility
By Vestal Corp February 25, 2026
Architecture and engineering services for a 56,500 SF design-build industrial laundry facility with heavy process equipment and integrated workflow systems.
TG Missouri Corporation (Toyoda) | Manufacturing Facility Addition
By Vestal Corp February 25, 2026
Architecture and engineering services for a 100,000 SF two-phase automotive manufacturing expansion with process piping, paint booths, and explosion-proof design.
SHOW MORE